There are tasks to be processed on a machine, forming a sequence. These tasks are numbered from to , so the order of the sequence is . The tasks are divided into several batches, and each batch contains several adjacent tasks. Starting from time , the tasks are processed batch by batch. The time required to complete task alone is . Before each batch starts, the machine needs a startup time , and the time required to finish this batch is the sum of the times required by all tasks in the batch.
Note: tasks in the same batch will be completed at the same time. The cost of each task equals its completion time multiplied by a cost coefficient .
Please determine a batching scheme that minimizes the total cost.
Input Format
The first line contains an integer .
The second line contains an integer .
The next lines each contain two integers and , meaning that the time required to complete task alone is , and its cost coefficient is .
Output Format
One line containing one integer, the minimum total cost.
5
1
1 3
3 2
4 3
2 3
1 4
153
Hint
For of the testdata, , , , .